RGR CONSTRUCTION AND ROOFING · WILMINGTON, NC

FORTIFIED Roofing in Wilmington, NC

Plan a roof upgrade with wind and rain resilience in mind. RGR coordinates the construction scope and documentation with an independent FORTIFIED evaluator.

Licensed General Contractor (Unlimited) #82033

Aerial view of a dark shingle roof with intersecting rooflines
Carolina Beach FORTIFIED Roof Replacement with CertainTeed Landmark PRO Moire Black · View project

NC Licensed General Contractor (Unlimited) #82033Roofing and connected construction under one project team.

Coastal project experience
Clear scope and photo documentation

Licenses & credentials

YOUR FORTIFIED ROOFING PROJECT

More than a shingle choice

FORTIFIED is an IBHS construction program. Its roof requirements address how the roof assembly is built and documented, rather than simply selecting a particular brand of shingles.

What RGR does for your fortified roofing project

Strengthen the roof assembly

The project scope considers roof-deck attachment, roof edges, and the selected roof covering under the applicable FORTIFIED standard.

Limit rain entry

A sealed roof deck and specified details help reduce the risk of water entering if the roof covering is damaged.

Plan independent evaluation

An independent FORTIFIED evaluator verifies required details and submits documentation for IBHS review. RGR’s role is the construction work and contractor-side coordination.

Keep the documentation

A FORTIFIED designation comes through the program’s review process. Plan inspections and records before work conceals important details.

Understand the upgrades behind a FORTIFIED Roof

FORTIFIED combines construction requirements with verification. Discuss the upgrade before scheduling a reroof so important details can be checked while they are still visible.

Attachment and roof edges

The program addresses roof-deck fastening and vulnerable perimeter details. The existing deck, roof covering and applicable standard determine the construction requirements. A product with a high wind rating alone does not establish a FORTIFIED designation.

The sealed roof deck

A sealed deck is intended to limit rain entry if the covering is damaged. It is part of an assembly that also includes suitable roof covering and edge details. Ask which approved approach will be used on your roof.

Who verifies the work?

RGR coordinates the construction. An independent evaluator verifies required details and assembles documentation for IBHS review. Some evidence must be captured before later layers conceal the work. IBHS determines whether the project receives a designation.

Why coastal conditions matter

For Wilmington-area homes exposed to wind and wind-driven rain, roof replacement is an opportunity to consider a more resilient assembly. FORTIFIED reduces risk; it does not make a home storm-proof.

How your FORTIFIED project moves forward

01

Discuss the property

Review the existing roof and whether a FORTIFIED project fits your replacement plans.

02

Coordinate the evaluator

Establish the construction scope, evaluation needs, and documentation sequence before work starts.

03

Build and document

Complete the required upgrades and coordinate verification at the relevant stages.

04

Complete program review

The evaluator submits the documentation; IBHS reviews it and determines designation.

Gray shingle roof on a brick home viewed from above
Mallory Creek FORTIFIED Roof Replacement in Winnabow, NC · View project

RGR PROJECT EXPERIENCE

Documented RGR FORTIFIED projects

Published project records identify these completed roof replacements as FORTIFIED projects. The designation process remains separate from RGR’s construction role.

Plan funding and evaluation before reroofing

Review RGR’s financing resources, including Carolina SURE, and confirm current eligibility and terms with the program provider. Grants and financing are not guaranteed.

Plan the construction and paperwork together

Keep the estimate, evaluation arrangements and any funding application aligned from the beginning. That helps you understand both the building work and the steps outside the contractor’s control.

  • Before committing. Discuss roof condition, the proposed covering, the evaluator’s role and which costs belong in each agreement.
  • Before work begins. Confirm documentation responsibilities and check any program application or approval steps directly with the funding provider.
  • At project completion. Keep your construction records and request the program’s designation documentation when review is complete.

A roofing product warranty, a FORTIFIED designation and an insurance policy serve different purposes. Discuss each with the party responsible for it; no discount, grant or coverage outcome is guaranteed.

Real RGR work

Recent FORTIFIED Roofing Projects

View all matching projects →

Winnabow, NC

Mallory Creek FORTIFIED Roof Replacement in Winnabow, NC

Mallory Creek

FORTIFIED Roofing

This Winnabow, NC roofing project upgraded a home in the Mallory Creek community with a FORTIFIED roof system using CertainTeed Landmark Algae Resistant shingles in Charcoal Black.

Customer experiences with RGR

Verified feedback about RGR’s work and project communication. Links open the original reviews.

“Elliot (project manager) was most helpful in explaining everything throughout the process. He made the process seamless.”
Dorothy Garrison-WadeMurrayville — Wilmington · Verified Google reviewRead review

Wilmington roots. Southeastern NC service.

RGR Construction and Roofing, LLC is based at 340 Shipyard Blvd, Wilmington, NC 28412. Tell us where your property is when you request a fortified roofing assessment.

FORTIFIED Roofing FAQs

Is FORTIFIED a roofing material?

No. FORTIFIED is a construction program with roof-system requirements and a verification process. Compatible roof coverings can include shingles or metal.

Is RGR the independent evaluator?

RGR provides construction and contractor-side coordination. An independent FORTIFIED evaluator verifies the required work and supplies documentation to IBHS.

Does a new roof automatically qualify?

No. The project must meet the applicable requirements and complete the evaluation and review process. Discuss FORTIFIED before work begins.

Are grants or financing available?

RGR’s Financing page links to approved resources, including Carolina SURE. Program availability, eligibility, and terms must be confirmed with the provider; funding is not guaranteed.

Does FORTIFIED guarantee no storm damage?

No roof system can guarantee that. FORTIFIED is intended to improve resilience to specified severe-weather risks.

Can I decide on FORTIFIED after the new roof is installed?

Discuss it before work begins. Required construction details and documentation may be concealed once the roof is complete. The evaluator can explain what can be verified for your particular property.

Is the FORTIFIED designation the same as a warranty?

No. Designation follows the program’s construction and verification process. Product and workmanship warranties are separate agreements, with their own terms. Ask for the applicable documents for each.

More FORTIFIED roofing questions

Plan your coastal roof upgrade

Share your property location and a few project details. RGR will help define the next construction step.

Discuss FORTIFIED Roofing

Your details are emailed to RGR for project follow-up. Email and delivery records may be retained. See the Privacy Policy above.